YueYangXiang day regenerative energy saving furnace Co., LTD
Sales hotline:0730-8554888
Products
Your present position:Home> Products>Shaft regenerative aluminum melting furnace
Shaft regenerative aluminum melting furnace



Shaft regenerative aluminum melting furnace
1, Structure figuration diagram (working with PMS) 1 page.
2, Structure figuration diagram (working with PMS) 1 page.
3, Structure figuration diagram of smoke purification system 1 page
4, Main Spec. Processing dimension.

 

   DIM.
Spec.
A
B
C
φ
φ1
H1
H3
H4
α
1T/h
3200
5800
3980
φ3680
φ800
720
5350
7650
2T/h
4300
7300
4600
φ4282
φ1000
750
5492
7792
7.5°
3T/h
4800
8360
5400
φ4956
φ1100
780
6450
8800
7.5°
5T/h
5280
9380
5930
φ5630
φ1300
810
6618
9200

 

5, Main processing combination.

 

   items
Spec.
Rated capacity(T)
Applying holding furnace
Ems.
 spec.
PMS.
Spec.
Tilting hydraulic cylinder
4 guiding rail ging  mechanism
Preheater M.F/H.F
1T/h
8
6T
DJ03-(X)
φ800
HSGL-250-16
0.5T/0.5m3
1/0.6million Kcal
2T/h
15
10T
DJ05-(X)
φ1000
HSGL-250-16
0.75T/0.75m3
1.6/1million Kcal
3T/h
20
15T
DJ05-(X)
φ1000
HSGL-280-16
1T/1m3
2/1.6million Kcal
5T/h
30
20T
DJ10-(X)
φ1200
HSGL-320-16
1.25T/1.25m3
3/2million Kcal

 

6,Main economic technical norms(for producing ingot alloy)

 

   Items
Specs.
Melting rate(t/h)
Production capacity (t/y)
M.F Energy consumption
(104Kcal/t)
H.F Energy consumption
(104Kcal/t)
M.F blower
H.F blower
Clean material burning damage (%)
Depend on material
Fuels applicable
1T/h
1+20%
5000
≤55
≤18
7.5Kw
5.5Kw
Primary al. ingot≤0.8%
Stripped electrical wire≤1.5%
Machine blocks≤2%
New chips≤3.5%
Fuel gas, light diesel oil, Poor quality diesel oil, heavy oil
2T/h
2+20%
10000
≤48
≤15
11Kw
5.5Kw
3T/h
3+20%
15000
≤45
≤15
15Kw
7.5Kw
5T/h
5+20%
25000
≤40
≤15
18.5Kw
11Kw

 

7, Parameters of PMS EMS

 

  Items
 
Spec.
Stirrer Spec.
Power of electrical transformer
Power factor
Electricity consumption (≈Kw˙h/t)
Liquid aluminum recycling capacity (≈t/min)
Stirrer cost(10 thous CHY)
EMS
PMS
EMS
PMS
EMS
EMS
PMS
EMS
PMS
EMS
PMS
1T/h
DJ03-(X)
φ800
50kvA
11Kw
0.4-0.6
≤20
≤5
3
4
22
65
2T/h
DJ05-(X)
φ1000
90kvA
15Kw
0.4-0.6
≤18
≤4
6
8
35
75
3T/h
DJ05-(X)
φ1000
90kvA
15Kw
0.4-0.6
≤15
≤4
6
8
35
75
5T/h
DJ10-(X)
φ1200
160kvA
22Kw
0.4-0.6
≤15
≤3
10
12
45
85

 

8, Main structure acteristics
1, 4 guiding rail bucket ging mechanism
a, applicable for all kinds of packed materials, crushed materials, ingots small bunches. b, top operational platform is designed for assist material ging, such as long material breakdown of ging machine
2, furnace roof cover cover hoist
The cast iron furnace cover is inner-laid with high-strength castable which enable its heat-resistance. Furnace cover shall be closed when there is no ging work.
3, shaft furnace
a, Smoke waste heat will be absorbed by those raw materials filled with the shaft. Depend on this function; energy consumption shall be reduced, which can reach minimum 35Kg/t.al.
b, Raw material quality shall be improved before dropping into liquid metal because of  having been preheated removed off organic impurities.
c, Melting rate shall be doubled after been fully preheated.
 
4, melting chamber
a, Raw material can make good use of smoke waste heat inside of the melting chamber too.
b, Furnace door which are specially designed for iron removing enables a very convenient operation of  iron removing.
5, heating chamber
a, The tangentially arranged furnace burner shall be only installed in the heating chamber. It will conduct a uniform full heating.
b,The operator is required to take out the floating slag brought out melting chamber  regularly keep metal surface clean.  
6, liquid metal recycling system
a, Installing permanent magnetic stirrer (PMS) or electrical magnetic stirrer (EMS).
b, High temperature liquid metal shall be pushed to melting chamber melt raw material while raw material were melted after contacting with the high temperature liquid metal,by which burning damage reduced to a very low level.
c, low temperature liquid metal will again bring floating slag back to heating chamber make the liquid surface clean.
d, Iron parts shall stag at the low temperature melting chamber, which will not be melted add iron components to the product.
 
7,tilting hydraulic cylinder
a, regular minor anger furnace body tilting(when there is about 30%-40% liquid left).Then there shall be no aluminum liquid at melting furnace, the operator can clean all slag at the furnace bottom.
b, Tilting furnace is able to pour out all liquid metal out.  
8, air preheater
a, Air preheater is a pipe plates combined double stage structure, enabling better preheating system.
b, When scraps were ged, there shall be too much flow resistance for smoke exhaust coming the shaft, then the furnace pressure controlling valve can be switched on so that air preheater can share some smoke reduce pressure.
c, While the furnace top cover closed, air preheater will be the only part of the furnace for smoke disging.
d, Air-preheater can make use of smoke waste heat increase temperature of the flame, then reduce energy consumption.  
 
9, holding furnace stirring:
a, holding furnace is designed in round shape, with tangential arranged furnace burner, by which both uniform furnace temperature low energy consumption can be achieved.
b, Holding furnace shall be work with the installed air preheater to reduce energy consumption.
c, Stirring system shall be installed shared between holding furnace melting furnace.(for high silicon adjustment)
10, smoke purification system
Be able to effectively purify smoke dust produced refining decomposition of organic impurities. Low operation cost.
 
IX, Application advantages.
1,Low Energy consumption:min oil consumption 35Kg/t˙Al.
1.a. shaft furnace inside preheating.                                                                                                       b, melting chamber preheating inside.                                                                                                   c, preheater preheating air                      
2, Low burning damage: Minimum net burning damage 0.6%.
a, Immersion type melting.  b,clean surface melting    c,speedy melting after preheating.
3, speedy melting
a, raw material is preheated. b,strong liquid metal recycling
c. high temperature preheating.
 
4, less iron 
a, no liquid metal iron removing.    b, low temperature at iron .     
c, short melting cycle.
5, high quality aluminum  metal
a, no overheating over burning.    b, impurities decomposition at shaft furnace  
c, small alloy components deviation.
 
6,Strong adaptability to crushing material:preheater shares smoke disging will enhance shaft furnace’s adaptability to crushing material.
7, Convenient slag skimming during operation: float slag skimming can be done anytime in heating chamber.  
8, Environment effect:less investment but better return, low operation cost.
 
X, reference price(unit:10000 CHY)

 

 item
Spec.
Recyclable  Al. M.F
Air preheater for M.F
Charging mechanism for M.F
H.F for used together
Air preheater for H.F
Total
Stirrer
PMS/EMS
1T/h
48
2(single      stage)
1.5(2 guiding rail)
15
1.5(single          stage)
68
65/22
2T/h
86
5.5
4
18
4.5
118
75/35
3T/h
120
7
5
23
5
160
75/35
5T/h
180
8.5
6
28
6.5
229
85/45
remark
 
 
May be self-provide
 
 
 
Maybe self-provide

 

Remark
Price given hereinabove does not include cost of civil, long distance transportation, ingot casting machine (billet casting machine), top operation platform smoke purification system.

 

【Return to previous page】【Close this page】
YueYangXiang day regenerative energy saving furnace Co., LTD All rights reserved©
Melting furnace, heat preservation furnace, room furnace, car heating furnace, mold shell baking furnace, heat treatment furnace
Technical support:www.zgzaizhi.com